Free Delivery on Orders Over £30
Prices Shown Include 20% UK VAT
Call Us On +44(0)1234 841221

Panasonic Air Conditioning Wall Mounted Inverter Energy Charge System SKE

Panasonic Air Conditioning Wall Mounted Inverter+ Heat-Charge CS-VE9NKE (2.5kW / 9000 Btu) A+++ 240V~50Hz

Panasonic Air Conditioning Wall Mounted Inverter+ Heat-Charge CS-VE9NKE (2.5kW / 9000 Btu) A+++ 240V~50Hz

£2,600.10 £2,166.75 (ex. VAT)
Stock Status: In Stock
Blog
The Panasonic VE Inverter+ HeatCharge unit a individual system with unique features including Wi-Fi control 

The Panasonic Heat-charge has the capacity to store heat on the outdoor unit which allows heating to start quickly just after turning on the heat pump. It also ensures maximum comfort and heat in the house even during defrost operation as Heat charge also stores heat to prevent cool air during defrost. ECONAVI builds-in a new Sunlight Detection technology to adjust output ideally thereby giving you the best comfort at anytime whilst saving energy. Furthermore, the Nanoe-G revolutionary air-purifying system utilises nano technology fine particles to remove and deactivate 99% of both airborne and adhesive micro-organisms like bacteria, viruses and mould. These technological breakthrough's make the Panasonic VE Inverter+ HeatCharge unit a individual system with unique features not matched by any other on the world air conditioning market. Ideal for cold locations.

 
Key Product Features:

 
  • Can be installed on existing R22 piping
  • Work up to -30 °C
  • Energy Charge System
  • Heat storage unit which realizes NON-STOP heating and fast heating function
  • Maximum efficiency and comfort with Econavi sunlight detection
  • Nanoe-G air purifying system, 99 % effective on both airborne and adhesive mould, viruses and bacteria
  • Super Quiet! Only 23 dB(A), equivalent to night-time in the country
  • More powerful airflow to quickly reach the desired temperature.
  • Powerful mode
  • Uniform dispersion of airflow
  • Automatic vertical airflow control
  • Hot start mode, increased comfort on heat pump mode, no cool airflow when process starts
  • Automatic restart after power cut
  • Removable, washable panel
  • Self-diagnosis function
  • Real time clock with dual ON&OFF timer
  • User friendly infrared remote control
  • Optional wired weekly timer with 6 settings per day and 42 settings per week
  • Connectivity function (indoor unit equipped with PCB port which can be connected to a outside network

 
How Quiet Is 23Db:


Image result for orionair.co.uk sound levels

Technical Specification:

 
Indoor CS-VE9NKE
Outdoor CU-VE9NKE
Cooling Capacity Nominal (min-max) KW 2.5 (0.60-3.00)
EER Nominal Energy Saving 5.15 A
SEER Nominal Energy Saving 8.6 A+++
P Design at -10C KW 2.5
Power Input Cooling Nominal KW 0.48
Annual Energy Consumption (cooling) 102
Heating capacity Nominal (min-max) KW 3.20 (0.60-7.7)
COP Nominal Energy Saving 5.47 A
SCOP Nominal Energy Saving 5.4 A+++
P Design at -10C KW 3.2
Power Input Heating Nominal KW 0.58
Annual Energy Consumption (heating) 830
 
 

 
Air Volume Cooling / Heating M3/h 600/600
Sound Pressure Level Cooling (hi/lo/s-lo) dB (A) 44/26 / 23
Heating (hi/lo/s-lo) dB(A) 44 / 27 / 24
Dimensions /Net Weight H x w x d mm/kg 295 x 890 x 275 – 14.5
Air purifying filter Nanoe-G
Outdoor Unit Power source (To Outdoor) / Recommended Fuse V/A 230/10
Connection indoor / outdoor mm2 4 x 1.5  
Sound Pressure Level Cooling  / heating (hi) dB(A) 49/49
Dimensions /Net Weight H x W x D mm/kg 623 x 799 x 299 / 43
Piping Connections Liquid – Gas Inch ¼ -3/8”
Piping length range (Precharge) Min / Max M 3-15 (7.5)
Elevation difference (in/out) Max M 5
Additional Gas g/m 20
Operating Range Cooling Min/Max C -10 / +43
Heating Min / Max C -25 / +24
 

                                   


PDF Data:






 
These air conditioning units must be installed by an F-Gas qualified engineer.  We can install the unit for you using our F-Gas Certified Engineers. Please note if you do not select our installation service  we will not ship the unit until we have obtained evidence from you that you will have the unit installed by an F-Gas qualified engineer. This is a requirement of the Article 11 (5) EC/517/2014 on fluorinated greenhouse gases and The Fluorinated Greenhouse Gases Regulations 2015.
 
Write an online review and share your thoughts with other shoppers!
Be the first to review this product